Conclusion of detail enforcement agreement: '13. 9. 27.
Payment of performance bond (Joongheung Const., Ltd., -> GFEZ): '13. 10. 22.
Start of development plan and working design engineering :'13. end of October
Application for exception of District Designation Cancellation: '14. 1. 6.
Future Promotion Plan
Approval of development plan change (MOTIE): During May, '14.
Application for Approval of enforcement plan (Developer -> GFEZ): During August, '14.
Approval of enforcement plan, compensation and work start: During February, '15
Seonwol High Park Complex
Outlook type Landscape Element Plan
View corridor
Establishment of outlook plan for main hills in the complex
Establishment of outlook corridor overlooking Pibongsan (138m), Ansan (121m), Baeburaksan (103m) and Oknyeobong (100m) from main entrance road and street
Building layout regulation and installation of greenway by including main street and land boundary in view corridor
View point
Establishment of access road connected to Shindae hinterland and main streets in the complex as view corridor
Establishment of regulation guideline including skyline and advertizing materials at view corridor
Sky Line
Skyline regulation so that main mountain terrain could be overlooked from view corridor
Nature type Landscape Element Plan
Green Network
As a place of surrounded landscape being formed by hills, green network is required to be planned so that hilly mountain would be preserved and it could be extensively connected to complex inside environment based on outlook plan
Creation of open space such as street park and mini-lot park
Creation of green network connecting green belt over the whole district considering pedestrian traffic line
Blue Network
Access to water side is supported by creating waterfront park in a way of preserving river extended from Shindae hinterland to Shindae Human Green Complex
Creation of pedestrian-friendly environment through riverside pedestrian passage, street lamp and bench
Urban type Landscape Element Plan
Culture Network
Creation of street connecting Geomdan-sanseong, Choongmusa and Suncheon-Japanese Castle that are major historical resources of the District outside as historical street
Creation of vivid central leisure, culture space linked with downtown park of Shindae hinterland
Urban Network
Inducement of ground level design for commercial and business facilities
Creation of streets in main traffic line of vehicles in order to ensure comfortable pedestrian environment through planting and street facilities
Creation of living street based on pedestrian traffic line as pedestrian-exclusive road and introduction of bicycle road
Other Landscape Element Plan
Nighttime Landscape
Creation of residing complex with calm and stable nighttime landscape
Creation of business, commercial complex with lively nighttime landscape