Incorporation registration of SPC (Yulchon 2nd Industrial Complex Development)
Application for approval of development plan change (former MOTIE)
Held advisory meeting of economic free zone planning board of former MOTIE
Evaluation, approval and notification of above meeting result of application for development plan change (draft) (MOTIE)
Future Promotion Plan
Preparation of development plan change (draft) reflecting the result of residing demand survey
Completed consultation for general effects evaluation including environmental effect evaluation
Approval, notification of development plan change and its execution plan
Land transfer and start of the work
Yulchon 2nd Industrial Complex
Outlook-type Landscape Element Plan
View corridor
View corridor for securing visual field of the main industrial road being connected from Yulchon 1st complex is required to be established and its district is required to be managed through designation.
Natural type Landscape Element Plan
Green Network
Installation of green belt that may buffer Aeyang matyrdom memorial hall, Yeosu Airport and industrial complex
Blue Network
Establishment and management of coastal hub landscape based on Songdo as specialized waterfront street
Urban type Landscape Element Plan
Culture Network
In-land tourism route plan linked with Aeyang martyrdom memorial hall linked with Yeosu Airport and coastal tourism route plan linked with Gwangyang Container Terminal
Other Landscape Elements Plan
Nighttime Landscape
Creation of bright and dynamic image in lineal container terminal complex and lineal layout along the land based on medium level color temperature
Entrance Landscape
Installation of facility representing an image of Gwangyang Bay, Yulchon 2nd Complex and Container Terminal at the entrance of southern road of Yeosu airport